Project Focus: sludge handling tech upgrade for Thames Water

A £20M project to improve 53 tanks at five Sewage Treatment Works has seen Thames Water tanks fitted with bottom and surface scraping technology

The sludge scraping technology being installed at Mogden STWThe sludge scraping technology being installed at Mogden STW

Drivers and Innovations

Drivers

● Residential development near Thames’ Sewage Treatment Works meant that primary settlement tanks needed to be covered to control odour
● Scraping technology needed along with cover to boost efficiency of process and ensure quality of sludge
● Sludge scrapers using traditional travelling bridge technology were unattractive due to headroom and maintenance concerns

Innovations

● Eight new primary settlement tanks have been built at Crossness, contributing towards increasing the sewage treatment capacity by 44% at the site
● At Beckton, 24 existing tanks had to be retrofitted with the technology
● All the tanks involved in the Thames Water project were rectangular in shape. However, the recently developed Zickert Rotating Sludge Scraper enables the same technology to be used for circular tanks.

A three-year project to increase capacity, improve odour control and deliver high-quality sludge for energy generation at Thames Water’s major Mogden, Beckton and Crossness sewage treatment plants is coming to fruition. Sludge handling technology is being upgraded as part of a multimillion pound investment in sewage treatment at Thames’ major London sewage treatment plants.

Since 2011, Thames has fitted a total of 53 new or refurbished primary settlement tanks with Zickert bottom and surface scraper technology, through a contract with supplier Hydro International worth more than £20M.

It’s all part of the £675 million upgrade of the five treatment works at Beckton, Crossness, Mogden, Long Reach and Riverside in Thames Water’s London Tideway Improvement programme, which has the overall aims of improving discharge quality, operating efficiency and biogas generation to supplement treatment plant energy requirements.

Primary Settlement Tanks at the works became a focus in part because of the need to control the odour experienced in nearby residential developments, explains Garry Strange, Sludge Strategy Manager for Thames Water.

“One of the key factors in Thames Water’s strategy was consideration for nearby communities where wastewater treatment plants are being encroached by residential and commercial development,” says Strange. “Engaging with our customers is very important to us, with odour control in particular being an understandable focus for local residents. As development has encroached on our sites we have been driven to cover more of our primary settlement tanks.”

Odour control

A major source of odour is the off-gases emanating from the primary sludge removal process in the open settlement tanks. The accepted practice is to provide a covering over the tanks, extract the contaminated air and scrub it to remove odours. With traditional travelling bridge technology, surface scum and bottom sludge scrapers requiring mounting on the exterior wall of the rectangular tanks, considerable headroom clearance is required for the moving machinery so covers become a major construction challenge; as well as covering more materials that are vulnerable to the corrosive damp atmosphere, there is high electricity consumption from handling the large volumes of enclosed air.

For these reasons, Thames were drawn to the bottom scraper and surface scum scrapers provided by Zickert: its surface scum scraper design has a low profile enabling covers to be installed at a much lower level compared to conventional travelling bridges, leading to lower air volumes to be purified and therefore a considerable saving in energy consumption. Meanwhile, the bottom scraper is a framework of plough-shaped, profiled blades which move the sludge in a reciprocating action to the hopper end of the tank.

“With the minimal headroom requirements of the Zickert top and bottom scraper technology, we were able to create an initial low volume cover design for some of the first tanks to be refurbished at Beckton,” says Strange. “This cover design was improved to be even closer to the top of the water at Mogden and Crossness, for more energy-saving air extraction for odour treatment.”

Thames Water decided to invest in the technology based on the proven performance of some existing installations at Beckton and Mogden. Starting in 2011, the most recent upgrade work has involved both new build of rectangular primary settlement tanks and refurbishment of existing tanks, completed this year.
At Crossness STW, eight new primary settlement tanks have been built, contributing towards increasing the sewage treatment capacity by 44% at the site, while supporting the need to provide energy-efficient odour control and deliver sludge to provide 20% of the plant’s energy needs.

The largest sludge treatment project is at Beckton STW, where a total of 24 existing sedimentation tanks have been retrofitted with the twinned sludge scrapers, adding to eight existing primary tanks already converted to the system.

At Mogden, eight primary settlement tanks had previously been retrofitted with the technology, while a further eight existing primary settlement tanks and five new tanks built were also retrofitted in a 2nd phase which is part of Thames Water’s £140M upgrade to increase sewage treatment capacity at the site by 50%.

Energy saving

“Considerable energy savings accrue with the implementation of close fitted tank covers,” Strange points out. “An important further objective is to increase our use of sludge for digestion and gas production. For example we have made significant investment in new high yield thermal hydrolysis plants, especially at the bigger sites, and have a couple more sites to expand to.

“To improve gas volumes, we have been looking at the performance of our Primary Settlement Tanks to remove sludge before thick blankets form. The use of Zickert technology can help achieve this as the technology means that the sludge has to come out fresher so we should be getting a better gas yield than with travelling bridges. We will be able to make comparisons over 2014/2015, particularly between Beckton and Long Reach, where travelling bridges have been retained, as the plant is not being encroached to the same degree.”

Operating efficiency

Maintenance and tank cleaning is another long term operating cost issue that will be assessed and compared. “My operations colleagues will be looking at this, as well,” Strange adds, “as it is part of the lifetime cost equation. At the moment, it seems that it is easier to maintain the tanks fitted with Zickert, as most wear parts are outside the tank whereas the travelling bridge has to be completely shut down during maintenance.”

Zickert offers significant advantages over conventional sludge & scum scraping technology with lower operating and infrastructure costs. The gentle action of the equipment produces a higher yield of sludge than conventional scrapers, while its higher throughput reduces the amount of secondary treatment required and produces more primary sludge with a higher calorific value.

“What has emerged, to date, is that these projects have certainly met their initial aims, and further benefits may well accrue as part of longer term operation”, says Strange. “Over the three years of installation, we were able to make further refinements to our tank installation design that maximised the immediate advantages of the Zickert scraper technology.”

Topic: Innovation

Newsletter

Sign up today for your daily news alert and weekly roundup

© Faversham House Group Ltd 2019. WWT and WET News news articles may be copied or forwarded for individual use only. No other reproduction or distribution is permitted without prior written consent.

Cookie Policy   |   Privacy Policy