powerPerfector's Voltage Power Optimisation (VPO) gives energy, cost and carbon savings by efficiently optimising a site's supply voltage. By optimising the voltage, electrical equipment runs more efficiently and consumes less energy. powerPerfector's power conditioning benefits create a more efficient, robust and reliable electrical supply for your site, protecting your entire electrical infrastructure. Our energy efficiency solution is unparalleled in terms of reliability and savings. It comes with a 15 year warranty and has a 50 year lifespan. VPO has maintained a 100% reliability record over 18 years and over 180,000 installations worldwide. Our simple four‐step evaluation process is free and without obligation and our savings estimates are underwritten by a guarantee on your Return on Investment. Our energy efficiency technology is trusted by some of the biggest names in energy and climate change. They include the energy regulator (Ofgem), the government's climate change department (DECC), the UK's main electricity distributor (National Grid), the UK's environmental guardians (Environment Agency), 160 local authorities and 20 government agencies.

Contact

Michael Pullan
powerPerfector House

1-10 Praed Mews,
London
W2 1QY
www.powerperfector.com

Voltage optimisation at the Tower of London - reigning in the energy costs

It had all the hallmarks of a great action movie, a priceless bounty - 'Symbols of the British Monarchy' , an historic location - 'The Tower of London' extensive planning by Tony King, the Historic Royal Palaces Head of Maintenance and Facilities, perfectly executed (pardon the pun).

As one of Britain's most famous historic palaces and London's most famous landmark, the Tower was chosen as the first of the Historic Royal Palaces to receive the powerPerfector treatment so It goes without saying that it is a great privilege to be involved with such a prestigious site.

The Tower which dates back to 1070 and has been extended over the centuries to the glorious building we know today is not only home to the Crown Jewels and the infamous Ravens, it is also home to the many Beefeaters and their families.

EV Bullen and Elecsis were the Tower's own contractors who did a superb job, no doubt the close proximity of the execution site for 'traitors to the crown' assisted in their fully focused and swift installation of the two pP830kVA units.

The units have now been in for over a month so figures will be available shortly, I am delighted to say that we are expecting to deliver savings as promised, so, no head's should roll!

After five years of proven results, powerPerfector has established itself as the single most effective immediate answer to addressing the need to reduce CO2 emissions and kWh consumption in buildings.

Energy Managers across sites as diverse as Manufacturing, Public Buildings, Data Centres, Retail and Leisure are now all benefiting from the ability to micro-manage their electricity at point of supply. The savings, of up to 20% are achieved across the sites' entire electrical infrastructure with one 'no maintenance' installation.

powerPerfector run workshops throughout the year and attendance is free. If you or your colleagues would like to attend please email me, I will then add you to the next invite list.

FIND US AT NEMEX SUSTAINABILITYLIVE 20TH - 22ND MAY STAND T82

powerPerfector

email: info@powerperfector.com

For further information please email powerPerfector