• Sign Up or Sign In

powerPerfector

About

powerPerfector's Voltage Power Optimisation (VPO) gives energy, cost and carbon savings by efficiently optimising a site's supply voltage. By optimising the voltage, electrical equipment runs more efficiently and consumes less energy. powerPerfector's power conditioning benefits create a more efficient, robust and reliable electrical supply for your site, protecting your entire electrical infrastructure. Our energy efficiency solution is unparalleled in terms of reliability and savings. It comes with a 15 year warranty and has a 50 year lifespan. VPO has maintained a 100% reliability record over 18 years and over 180,000 installations worldwide. Our simple four‐step evaluation process is free and without obligation and our savings estimates are underwritten by a guarantee on your Return on Investment. Our energy efficiency technology is trusted by some of the biggest names in energy and climate change. They include the energy regulator (Ofgem), the government's climate change department (DECC), the UK's main electricity distributor (National Grid), the UK's environmental guardians (Environment Agency), 160 local authorities and 20 government agencies.

Contact

Michael Pullan
powerPerfector House

1-10 Praed Mews,
London
W2 1QY
www.powerperfector.com

Voltage optimisation - Saving Energy - The frontline approach to cutting CO2..

A 150kVA powerPerfector Voltage Power Optimiser with a 9% optimisation setting was installed at The Good News Press, Essex, on 8th September 2007. Optimising voltage by 9% ordinarily yields a 14.5%, though in this case average consumption for the period since the powerPerfector was installed has been reduced immediately by 15.1%, with savings of 18.5% evident from a longer-term analysis. View the full case study on the website.

Another site exceeding expectations.

(click here to view the case study)

A 420kVA Voltage Optimiser with a 9% optimisation setting was installed at British and Brazilian (formerly known as Frupac - part of Produce World) in Peterborough, on 20th October 2007.

British and Brazilian produce Ltd are specialists in the supply of grapes, melons and stone fruits to leading supermarkets, food service companies and food processors here in the UK. The main electrical load is spread across refrigeration, conveyors and
packaging machinery.

Analysis of the electricity consumption since the installation of the powerPerfector indicates that 16.% savings, exceeding the predictions of a more typically expected saving of 14.5%, are being made relative to previous consumption levels.

The powerPerfector is ensuring that the site operates with a high level of efficiency, as well as benefiting from improved power quality and protection against transients of up to 25kV.

THERE IS ONLY ONE VOLTAGE OPTIMISER - GET POWERPERFECTED

For further information please email powerPerfector

© Faversham House Group Ltd 2019. WWT and WET News news articles may be copied or forwarded for individual use only. No other reproduction or distribution is permitted without prior written consent.

Cookie Policy   |   Privacy Policy