• Sign Up or Sign In

powerPerfector

About

powerPerfector's Voltage Power Optimisation (VPO) gives energy, cost and carbon savings by efficiently optimising a site's supply voltage. By optimising the voltage, electrical equipment runs more efficiently and consumes less energy. powerPerfector's power conditioning benefits create a more efficient, robust and reliable electrical supply for your site, protecting your entire electrical infrastructure. Our energy efficiency solution is unparalleled in terms of reliability and savings. It comes with a 15 year warranty and has a 50 year lifespan. VPO has maintained a 100% reliability record over 18 years and over 180,000 installations worldwide. Our simple four‐step evaluation process is free and without obligation and our savings estimates are underwritten by a guarantee on your Return on Investment. Our energy efficiency technology is trusted by some of the biggest names in energy and climate change. They include the energy regulator (Ofgem), the government's climate change department (DECC), the UK's main electricity distributor (National Grid), the UK's environmental guardians (Environment Agency), 160 local authorities and 20 government agencies.

Contact

Michael Pullan
powerPerfector House

1-10 Praed Mews,
London
W2 1QY
www.powerperfector.com

Greener Banks On The Horizon - Investing With powerPerfector

powerPerfector is proving an effective tool in energy efficiency / carbon reduction programmes where cutting waste at source is the obvious first step. Financial institutions are the latest sector to start rolling out the technology......read on

Halifax Bank Of Scotland

Halifax Bank of Scotland is one of the first High Street Banks to start rolling out powerPerfector technology after a year of proven results.

The first pP420kVA unit was installed in Commercial Street, Halifax in January of last year as part of the banks energy efficiency program.

The results generated by HBOS have confirmed powerPerfector original savings estimate.

The unit has quietly, efficiently been providing savings in electrical consumption, costs and carbon emissions across the entire building's electrical infrastructure.

Installing the powerPerfector has the additional benefit of protection against transients and of suppressing harmonics, crucial advantages when large amounts of data are stored.

The initial phase of the roll out will be the installation of another nine units in High Street Banks/Offices around the UK, new sites will be up and powerperfected by early spring.

Royal Bank Of Scotland

After the success of the first RBS 830kVA powerPerfector installation in Doncaster on 18th November 2006 further sites are lined up for powerperfecting in the next three months.

The Doncaster unit is producing 11.3% reduction in consumption and a 10.7% reduction in daily maximum demand. Improving the electrical efficiency and producing savings at the site as predicted.


National Treasures - The Tate Gallery

The Tate storage facility holds approximately 95% of the assets of the Tate Gallery, worth billions of pounds. As a critical site it has a sophisticated climate controlled environment to protect our national treasures.

The focus on protection and best practice is evident in gaining access to the site and we were pleased to add extra security to the supply and site, along with the benefits of energy and cost saving with the installation of a 210kVA powerPerfector unit 24th July 2006.

This has resulted in a reduction in average kWh consumption of over 12.9%.

Learn more...case study for Tate Gallery

For further information please email powerPerfector

© Faversham House Group Ltd 2019. WWT and WET News news articles may be copied or forwarded for individual use only. No other reproduction or distribution is permitted without prior written consent.

Cookie Policy   |   Privacy Policy