• Sign Up or Sign In

KEE Process Limited and KEE Services Limited

About

KEE Group consists of two operating companies, KEE Process Limited and KEE Services Limited. Both these companies have over 50 years experience in the development, design, manufacture, servicing, maintenance and operation of wastewater treatment plants and systems. KEE seek to identify and satisfy the needs of their customers by providing quality engineered solutions priced to offer value for money. Continuing investment in research and development ensures that the products and services supplied by KEE incorporate the latest technology to protect the environment. KEE operates and has formal registration under an Integrated Management System from the British Standards Institution (BSI). KEE has successfully integrated (QMS), (OHS), (EMS) standards in accordance with the PAS99 requirements

Contact

Mrs Mary Welsh
College Road North, Aston Clinton,

Aylesbury
Buckinghamshire
HP22 5EZ
www.keegroup.co.uk

SETTLEMENT TANK

KEE HAVE LAUNCHED THEIR REDESIGNED SECTIONAL HOPPER GRP FINAL CLARIFIERS - Current health and safety legislation for building and construction sites are such, that working in a confined space or in an excavation or at elevated height, can cause problems with respect to the H&S requirements.

No Image



KEE pioneered the use of GRP in wastewater treatment in the 1960s and have supplied many hopper bottom final clarifiers of large diameters which necessitate assembly on site.  To ensure that all the joints are water tight and do not need a substantial amount of fixings, KEE have developed a gluing procedure for assembling the tanks.  This enables the tank to be assembled in relatively short periods so the need to laminate joints on sites, or to spend long hours bolting together the flanges, is no longer necessary.


One downside of the bolted construction has always been the potential for the joint to leak with the gasket material not performing.  This potential risk has been eliminated by KEE introducing their innovative gluing technology and design which gives a much better strength to the joint and also retains the stiffness of the flange much more than with bolted construction.
The new tank includes launders with sloping floor to ensure complete drainage of launder.  The weir plates on the launders remain adjustable to enable site fine tuning and the whole tank can be assembled and erected in half the time it would normally take for a bolted construction.

© Faversham House Group Ltd 2021. WWT and WET News news articles may be copied or forwarded for individual use only. No other reproduction or distribution is permitted without prior written consent.

Cookie Policy   |   Privacy Policy