• Sign Up or Sign In

MSE Hiller Limited

About

MSE Hiller Ltd, Mobile and Separation Equipment (M&SE) specialise in the rental and sales of dewatering centrifuges into environmental applications within the water treatment and process industries. Effluents and sludges may be dewatered or thickened by use of either fixed or temporary installed mobile dewatering plants. Trial units are available for on site testing of applications and unit capacities range from 1 to 105 m3 per hour. The MSE Hiller range of decanter type centrifuges offer high performance sludge dewatering and thickening and there are over 5,600 units installed Worldwide. The centrifuges can be supplied with either hydraulic or electrical regenerative back drive capability for automatically adjusting the scroll speed to suit the solids loading of the feed. The hire service is available with or without process operatives and can be used for on site lagoon and pond clearances, digestor cleaning, seasonal peak loads/breakdown coverage etc. Mitsubishi rayon membrane systems can be offered for high efficiency separation and cleaning of effluents offering water re-use options to customers. Further details are available

Contact

Mr Huw Thomas
Harper Way

Markham Vale,
Chesterfield, Derbyshire
S44 5JX
www.mandse.com

75 kW of PV enhances MSE Hiller's environmental credentials

MSE Hiller has recently switched on an additional 75 kW of Photovoltaic (PV) panels which further enhance it's environmental credentials at its Markham Vale offices and workshops.

The scheme saw the company install some 300 x 250W (500 M sq) of high efficiency PV panels over a 2 week period in December 2014 by local Chesterfield company Custom Solar. www.customsolar.co.uk. This will make MSE Hiller totally self-sufficient in electricity going forward.

With ISO 14001 being a prerequisite for the business with many of MSE Hiller's customers and in a period where reporting of carbon footprints and reducing emissions has become such an important aspect when looking to build partnerships with customers, the installation of a renewable energy system like this is a major step forward for the company.

MSE Hiller has taken control of it's energy expenditure by generating it's own electrical power on site.

Electricity prices historically have risen at approx. 10% per annum so generating our own electricity like this can protect us against future price rises and ensure that our business is not exposed to uncontrollable growing overheads.

For further information please email MSE Hiller Limited

© Faversham House Group Ltd 2019. WWT and WET News news articles may be copied or forwarded for individual use only. No other reproduction or distribution is permitted without prior written consent.

Cookie Policy   |   Privacy Policy